New Construction / Fabrication Inspection Support

28

Inspection and Testing during the Manufacturing Phase :

  • Above Ground Storage Tank Inspection
  • Pressure Vessel Inspection
  • Piping Inspection
  • Project Management & Consultancy for storage tanks and related piping
  • Welder Qualification Witnessing, Welding Procedure Preparation, Welder Certificate Renewal
  • Hydro test witnessing, Pneumatic test witnessing
  • Dimensional inspection, Structural alignment and bolt tightening inspection
  • Coating condition monitoring services
  • Powder coating inspection behalf of client
  • Blasting and coating inspection along with chloride and visual test as per client spec as a TPI
  • Galvanizing inspection and reports endorsement as a TPI inspection agency
  • Material receiving inspection and report submission as a TPI agency
  • MTC review and Mechanical test witness for material up gradation from 3.1 to 3.2
  • Industrial integrity test like boiler (Fired and unfired) and other upstream lines
  • Factory acceptance test (FAT) / Site acceptance test (SAT) witnessing and endorsement
  • Stage wise witness and report submission according to ITP as a TPI Agency
  • Quality audit to subcontractor behalf of client
  • Quality plan, ISO documentation preparation for client
  • Rotating equipment alignment inspection
  • Project final dossier/ Manufacturer data report (MDR) review and endorsement as a TPI